Process Technology Tytan Instruction Manual

Browse online or download Instruction Manual for Water heaters & boilers Process Technology Tytan. Process Technology Tytan Instruction manual User Manual

  • Download
  • Add to my manuals
  • Print

Summary of Contents

Page 1 - Instruction Manual

TYTANTM Inline Water Heater Instruction Manual www.process-technology.com 7010 Lindsay Dr., Mentor, OH 44060 Phone: 440-974-1300 Fax: 440-

Page 2 - TABLE OF CONTENTS:

MODEL NUMBER: Process Technology model numbers are designed to offer some description of the heater construction, including features and options. The

Page 3 - RELATED DOCUMENTS:

Model Number (Continued): Model Number Explanation: Provided below is an example of a typical model number along with an explanation of each part. T

Page 4 - INTRODUCTION:

Model Number Explanation (continued): TY-072-480-3-SC-RI c d e f g e Heater Voltage. The first character following

Page 5 - INTRODUCTION (Continued):

FACILITY REQUIREMENTS: Before installing the TYTAN inline water heater confirm the facility requirements listed below. Space Requirements: The TYT

Page 6 - SYSTEM SPECIFICATIONS:

Facility Requirements (continued): Water Plumbing Requirements: The customer supplied inlet and outlet plumbing must be rated to withstand temperature

Page 7

INSTALLATION: NOTE: The mounting and installation of this unit should only be performed by qualified personnel. Inspection and Uncrating: The wall-mo

Page 8

INSTALLATION (Continued): Uncrating the wall-mounted units: 3) Remove the top of the crate. 4) Remove any protective packaging material and any othe

Page 9

INSTALLATION (Continued): Positioning and Mounting: Wall-mounted units: The wall-mounted TYTAN units must be anchored to a support structure that can

Page 10 - MODEL NUMBER:

INSTALLATION (Continued): Plumbing: The plumbing installation of this unit should only be performed by qualified technicians. Verify that the water

Page 11 - TY-072-480-3-SC-RI

INSTALLATION (Continued): Plumbing (Continued): When tightening all connections on this unit, be sure to support the TYTAN heater connection to preve

Page 12

TABLE OF CONTENTS: RELATED DOCUMENTS ... 3 INTRODUCTION...

Page 13 - FACILITY REQUIREMENTS:

INSTALLATION (Continued): Plumbing (Continued): PRV Plumbing Connection: 1) Test fit the drain pipe to insure proper length. The PRV must be connec

Page 14 - Electrical Requirements:

INSTALLATION (Continued): Wiring: 2) Remove front cover of the control side of the cabinet by loosening the cover mounting screws. 3) Cut a hole in

Page 15 - INSTALLATION:

INSTALLATION (Continued): Wiring: RC1 (RS232), RC2 (RS485) Options: Serial Communication Interface: Figure 10: Location of optional interface connect

Page 16 - INSTALLATION (Continued):

INSTALLATION (Continued): Wiring: RC3 (4-20 mA) Option: Process Output: Units provided with the RC3 option will include a 4-pin connector plug, for wi

Page 17 - Positioning and Mounting:

INSTALLATION (Continued): Wiring: RC3 option process output pin assignment: Pin Number Signal Signal type Description 1, 2 EMO Input, Dry contacts

Page 18 - Plumbing:

OPERATIONS: Control Panel: Figure 14: Temperature Controller and Control Panel. The TYTAN Heating System incorporates a self-tuning, PID microprocess

Page 19 - Plumbing (Continued):

OPERATIONS (Continued): Temperature Controller E5CN: This section contains information for the E5CN controller only. Do not use these instructions f

Page 20 - Wiring:

OPERATIONS for E5CN (Continued): Display Symbols: Operation Indicators: ALM1: Illuminates when the alarm 1 setting is ON (tripped) (120°C). ALM2:

Page 21 - TORQUE SPECIFICATIONS

OPERATIONS for E5CN (Continued): Using the keys: This section describes the basic functions of the front panel keys. Level Key: Press this key to mo

Page 22

OPERATIONS for E5CN (Continued): Mode Parameter Settings: The Omron E5CN temperature controller has been programmed prior to shipment, so no additiona

Page 23

RELATED DOCUMENTS: The following documents are to be used in conjunction with this manual: ANSI/NFPA70 – National Electric Code→, latest edition. T

Page 24

OPERATIONS for E5CN (Continued): Changing Primary Set Point: The process Set Point can be changed in the normal display mode. 1. 2. Press the up and

Page 25 - OPERATIONS:

OPERATIONS for E5CN (Continued): PID Tuning: The Omron E5CN temperature controller incorporates the capability of automatically tuning the PID paramet

Page 26 - DISPLAY FEATURES:

OPERATIONS for E5CK: Temperature Controller E5CK: This section contains information for the E5CK controller only. Do not use these instructions for

Page 27 - Display Symbols:

OPERATIONS for E5CK (Continued): A/M key: Switches the controller between auto and manual operation. Display key: Allows selection of the mode when d

Page 28 - Selecting Menu Levels:

OPERATIONS for E5CK (Continued): Selecting Modes: The modes are selected by pressing the Display Key for one second or greater. The up and down arrow

Page 29 - Mode Parameter Settings:

OPERATIONS for E5CK (Continued): Mode Parameter Settings: The Omron E5CK temperature controller has been programmed prior to shipment, so no additiona

Page 30 - M-45-02 TYTAN Manual

OPERATIONS for E5CK (Continued): Changing Primary Set Point: The process Set Point can be changed in the level 1 mode menu. 3. 4. Press the Display K

Page 31 - PID Tuning:

OPERATIONS for E5CK (Continued): High Alarm: The Digital Temperature Controller incorporates an independent alarm. The High Process Temperature Alarm

Page 32 - Temperature Controller E5CK:

OPERATIONS for E5CK (Continued): PID Tuning: The Digital Temperature Controller incorporates the capability of automatically tuning the PID parameters

Page 33

OPERATIONS (Continued): Over-Temperature Controller FDC-L91: 1. This over-temperature controller is located inside the electrical portion of the

Page 34 - Selecting Modes:

INTRODUCTION: The following symbols and warning labels appear on the unit and in the instruction manual. The table below provides an explanation of

Page 35

OPERATIONS (Continued): Mode Parameter Settings: The Futuredesign FDC-L91 temperature controller has been programmed prior to shipment, so no programm

Page 36 - Changing Primary Set Point:

OPERATIONS (Continued): Programming FDC-L91: Every time the primary set point of the main controller E5CN is modified, the SP2 setting on the over-te

Page 37 - High Alarm:

OPERATIONS (Continued): System Start-Up: 1) Turn on water at its supply source. Allow water to flow for several minutes to insure that all entrapped

Page 38

MAINTENANCE: The Tytan water heater requires only a routine inspection every 6 months to check the operation of the various operation and safety devic

Page 39

WARRANTY: All PROCESS TECHNOLOGY equipment, heaters and controls have been carefully inspected before shipping and are warranted to be free from defec

Page 40

INTRODUCTION (Continued): The TYTAN water heater is designed for inline heating of de-ionized (DI) water, city water, reverse-osmosis (RO) water, and

Page 41

SYSTEM SPECIFICATIONS: Product TYTAN inline titanium water heater Standards UL, cUL standard CE, SEMI S3 optional (-SC) Available Wattag

Page 42 - System Shut-Down:

SYSTEM SPECIFICATIONS (Continued): Figure 1: Dimensional Drawing, 12kW – 48kW Units M-45-02 TYTAN Manual Revision - Date: 01 – 11/16/07 7

Page 43 - MAINTENANCE:

SYSTEM SPECIFICATIONS (Continued): Figure 2: Dimensional Drawing, 72kW Unit M-45-02 TYTAN Manual Revision - Date: 01 – 11/16/07 8

Page 44 - WARRANTY:

SYSTEM SPECIFICATIONS (Continued): Figure 3: Dimensional Drawing, 96kW – 144kW Units M-45-02 TYTAN Manual Revision - Date: 01 – 11/16/07 9

Comments to this Manuals

No comments